Ngong Shuen Chau Near Depot 8 Container Terminal WanWREN Hydraulic system for pulling test

Client : Federal Steel Works Engineering Ltd.
Site Location : Ngong Shuen Chau Near Depot 8 Container Terminal
Project Name : Route 8 - Ngong Shuen Chau Viaduc, between Tsing Yi and Cheung Sha Wan
Client bought our distribution WREN Hydraulic system for pulling test use.
Including :
100tons Double-Acting Holl-O-CylindersRCS1002 100Ton S/A Spring Return Cylinder Spring Return Cylinder x 8 units.----1pc
Electric Pumps----1pc
Manually Operated Check Valve----1pc
High Pressure Hydraulic Hoses----2pcs of 6 meters