Client : Federal Steel Works Engineering Ltd. | |
Site Location : Ngong Shuen Chau Near Depot 8 Container Terminal | |
Project Name : Route 8 - Ngong Shuen Chau Viaduc, between Tsing Yi and Cheung Sha Wan | |
Client bought our distribution WREN Hydraulic system for pulling test use. | |
Including : | |
100tons Double-Acting Holl-O-CylindersRCS1002 100Ton S/A Spring Return Cylinder Spring Return Cylinder x 8 units. | ----1pc |
Electric Pumps | ----1pc |
Manually Operated Check Valve | ----1pc |
High Pressure Hydraulic Hoses | ----2pcs of 6 meters |